Estimate the equipment and operational costs of such an antiproton complex, producing a preliminary design report

Taking the above theoretical work, a design report will be generated wherein the equipment and operational costs of the antiproton production facility will be documente. The work plan includes:

⇒ Determine cost/benefit differences between pulsed and continuous beam operations
⇒ Produce a cost estimate for the proton accelerator complex
⇒ Produce a cost estimate for the antiproton accelerator complex
⇒ Estimate the annual manpower and utility costs of the entire facility

 

This page will be filled in as research progresses